Successful Project : Farewell BOKOR CPP!

ddni bokor project success

Share This Post

Share on facebook
Share on linkedin
Share on twitter
Share on email

This morning the Petronas Carigali Bokor Centralised Processing Platform (CPP) topsides, left MMHE’s yard in Johor, Malaysia, on Boskalis’ Heavy Transport Vessel Forte.

The construction weighs 11,238 MT.

The CPP will be installed by Boskalis with the Forte on DP as a float over offshore Sarawak.

Subscribe To Our Newsletter

Get updates and learn from the best

More To Explore

ddni bokor project success
Uncategorized

Successful Project : Farewell BOKOR CPP!

This morning the Petronas Carigali Bokor Centralised Processing Platform (CPP) topsides, left MMHE’s yard in Johor, Malaysia, on Boskalis’ Heavy Transport Vessel Forte. The construction weighs 11,238 MT. The CPP will be installed by Boskalis with the Forte on DP as a float over offshore Sarawak.

Do You Want To Boost Your Business?

drop us a line and keep in touch

wow-surprised-face-asian-female-black-clothes-with-hand-point-empty-space
Scroll to Top